Cooper River Bridge Figures 2.1 - 2.10
|
|
Figure
|
Description
|
Thumbnail
|
|
2.1
|
Framework for submersible cofferdam. Constructed on land.
|
|
|
2.2
|
Framework being floated out to the location of the pier.
|
|
|
2.3
|
Construction of cofferdam. Note that sheetpiles have been installed to form wall around perimeter.
|
|
|
2.4
|
Top of steel H piles at top of riverbed inside the cofferdam. The entire cofferdam will soon be filled with concrete to form the foundation.
|
|
|
2.5
|
Barge ferrying concrete for pouring of pier.
|
|
|
2.6
|
Construction of pier above water level. Note that cofferdam has been flooded. Also note the use of a slipform.
|
|
|
2.7
|
Another view of pier construction. Hoisting buckets of concrete for placement inside form.
|
|
|
2.8
|
One pier is completed, formwork is installed for "hammerhead" beam at top of pier.
|
|
|
2.9
|
View of reinforcing bar cage and post-tensioning ducts inside "hammerhead" beam at top of pier.
|
|
|
2.10
|
View of post-tensioning anchorage in one of the approach piers-- similar to that used for the main piers.
|
|