Case Studies : Cooper River Bridge : Pier and Foundation
Cooper River Bridge Figures 2.1 - 2.10
Figure Description Thumbnail
2.1 Framework for submersible cofferdam. Constructed on land.
2.2 Framework being floated out to the location of the pier.
2.3 Construction of cofferdam. Note that sheetpiles have been installed to form wall around perimeter.
2.4 Top of steel H piles at top of riverbed inside the cofferdam. The entire cofferdam will soon be filled with concrete to form the foundation.
2.5 Barge ferrying concrete for pouring of pier.
2.6 Construction of pier above water level. Note that cofferdam has been flooded. Also note the use of a slipform.
2.7 Another view of pier construction. Hoisting buckets of concrete for placement inside form.
2.8 One pier is completed, formwork is installed for "hammerhead" beam at top of pier.
2.9 View of reinforcing bar cage and post-tensioning ducts inside "hammerhead" beam at top of pier.
2.10 View of post-tensioning anchorage in one of the approach piers-- similar to that used for the main piers.